This acrylic swimming pool wall in Dubai sits on an upper-level pool deck within a residential development. Thick cast acrylic panels were produced and checked in Grandview’s factory, packed for export, then lifted by mobile crane from the street to the pool level.
Unlike most of our pool case studies, this record follows the panel the whole way: workshop, measuring table, export crate, crane hook and finally the filled pool.

Location
Dubai
United Arab Emirates
Application
Upper-level pool
with acrylic side wall
Grandview supply
Thick cast acrylic panels,
export crating
Project record
Factory, shipping & site
photos + site video
The finished pool
Water held at the edge of the deck
The main pool is raised above the surrounding deck. Along one side, the acrylic panel replaces a solid tiled wall, so the water body can be read in section from the walkway and the lower channel beside it. The depth marker at the coping reads 1.80 m.



A wall you read in section
From the side, the panel shows the full water depth instead of just the surface.
Framed by mosaic
Blue mosaic tile continues around the opening, so the acrylic reads as part of the pool shell.
Built above ground level
Because the pool sits on an upper deck, panel delivery depended on crane lifting from the street.
Project route
From our workshop to a Dubai rooftop, in four stages
A thick acrylic pool panel is only as good as its last handling step. These photographs follow the Dubai order from the factory floor to the crane lift on site.
01
Panel production
Thick cast acrylic, cut and edge-finished to the drawings
The panels were laid flat on workshop supports after machining. The photographs show the polished edges and the optical clarity through the full thickness of the sheet before the protective film was replaced for shipping.



02
Dimensional checks
Thickness and size measured before packing


Every pool panel is checked against the approved drawing before it leaves the factory. On an upper-level pool, there is little room for correction once a panel has been lifted onto the deck, so the measuring happens on the workshop table, not on site.
03
Export packing
A crate built for the lift as well as the sea voyage
For the Dubai shipment, the panels were wrapped, laid flat on a timber base and enclosed in a reinforced frame with strapping and lifting slings. The same crate later had to be picked up by crane on site, so it was designed to be handled as one load.


View one more panel photo before packing

04
Lifting on site
From the street to the pool deck by mobile crane
In Dubai, a mobile crane was positioned on the road beside the building. The crated panel was rigged with chains and lifted past the façade to the pool level, where the installation team could take it over.


On site
A short clip from the project
Photographs show the panel; a video shows the scale of the space around it. This short clip was recorded at the Dubai project and shared with the Grandview team.
For contractors & consultants in the Gulf
Planning an elevated acrylic pool in the UAE?
On podium and rooftop pools, the panel design is only half the brief. Logistics to the pool level and the outdoor conditions need to be on the table from the first drawing review.
| Item | What to send us | Why it matters on an upper-level pool |
|---|---|---|
| Opening & panel drawings | Visible window size, full panel outline, recess details and quantity. | Panel size and weight determine crate design and lifting method. |
| Water depth | Maximum operating water level relative to the panel base. | Reviewed together with span and edge support to define thickness. |
| Lifting route | Crane position, reach to the pool level, any façade or canopy obstructions. | The crate is planned around how it will be picked up and set down on site. |
| Site storage | Where the panel will wait between delivery and installation. | Shaded, flat, protected storage avoids damage to the panel before it is set. |
| Waterproofing interface | Pool shell detail, joint design and surrounding tile or stone finishes. | Installation must be coordinated with the pool contractor’s waterproofing system. |
For sizing inputs, read our acrylic pool window thickness guide. For site coordination, see our pool acrylic installation support.
Practical questions
Rooftop acrylic pool panels: common questions
Can thick acrylic pool panels be lifted onto a rooftop or podium deck?
Yes. In this Dubai project, the crated panel was lifted from the street to the pool level by mobile crane. The crane position, lifting points and set-down area should be agreed before the crate is designed.
How are acrylic pool panels protected for shipping to the UAE?
Panels are covered with protective film, wrapped, supported flat on a timber base and enclosed in a reinforced frame with strapping. Lifting slings can be fitted so the crate can be handled directly on site.
How thick does the acrylic need to be for a similar pool wall?
Thickness is project-specific. It depends on water depth, panel span and how the edges are supported. Send the drawings and water level so the panel can be reviewed; a project photograph alone is not enough to select a thickness. Our cost guide explains how size and thickness affect the quotation.
Custom acrylic for Middle East pool projects
Working on a rooftop or podium pool? Send us the drawings.
For pool contractors, MEP and civil consultants, developers and architects: share the panel drawings, water depth, support details, quantity and site lifting conditions. Grandview will review the acrylic requirements and prepare a quotation for the agreed scope.
WhatsApp / Phone: +86 133 1880 8573 · Email: [email protected]
Project photographs and video: Grandview pool project in Dubai, UAE, covering factory production, inspection, export packing, on-site crane lifting and the completed pool.