PROCESS 09 / 10PROTECTION · SUPPORT · LOADING

Packing & shipping.
Prepared for the journey.

Large acrylic panels need more than a protective wrap. Our packing combines surface cushioning, protective panels and steel support frames, with the loading arrangement planned around the packed dimensions, weight and destination.

LayersSurface protection
FramesSupport for the panel
LiftingPlanned handling
Large rectangular acrylic panel packages held in metal frames with plastic wrapping, green straps and wooden base supports.
PACKING & HANDLINGPROTECTION WITH A PURPOSE

From the Finished Face to the Transport Frame

Discuss Your Project
PACKING FOCUS 01

Protect finished faces

Surface film, cushioning and protective panels separate the acrylic from the outer packing structure.

PACKING FOCUS 02

Support the packed unit

Crates and steel frames are selected around the panel shape, packed weight and handling needs.

PACKING FOCUS 03

Plan the handover

Package dimensions, transport arrangements and receiving-site access are confirmed before dispatch.

Stacks of large acrylic panels with protective wrapping, edge supports and green strapping bands on workshop pallets.
Wrapped and strapped panel stacks
  1. 01

    PE surface film

    A contact layer protects the finished acrylic face.

  2. 02

    10 mm EVA cushioning

    Cushioning sits between the surface film and protective panels.

  3. 03

    Fumigation-free wood panels

    Outer protective panels shield the cushioned faces and edges.

  4. 04

    Outer PE wrap

    An outer wrapping layer provides additional moisture protection.

  5. 05

    Welded steel support

    A frame supports the packed unit during handling and transport.

  6. 06

    Lifting slings

    Slings form part of the planned lifting arrangement.

Our published packing method; the final build-up is selected for the panel, route and destination requirements.

Watch the loading clipA short workshop view · 21 sec
Two wooden-panel shipping crates reinforced at the edges and corners, standing on the factory floor.
Panelled shipping crates
Tall protected acrylic panel packages held upright in steel supports beside a flat packaged panel in the workshop.
Steel supports for upright packages
Large rectangular acrylic panel packages laid flat in metal perimeter frames with protective coverings, green straps and lifting slings.
Protected panel packages
03 · LOADINGTHE PACKED UNIT IN MOTION

Lifting & Loading as One Plan

Handling is planned around the packaged unit, including its supports, lifting arrangement and transport position.

  1. Support the geometry.Flat, upright and circular components need different frame layouts.
  2. Coordinate the lift.Confirm the packed weight, lifting equipment and sling arrangement.
  3. Secure for the route.Loading position and cargo restraint must suit the vehicle and journey.
Mobile crane and yellow lifting beam handling a long steel-framed acrylic load above a flatbed truck outside the factory.
Crane-assisted loading onto a flatbed
Large circular acrylic panel with protective covering and green straps held vertically in a triangular steel support frame.
FRAME PREPARATIONCircular panel in its support frame
Circular acrylic panel held upright in a triangular steel frame on a red open-sided cargo truck.
ROAD TRANSPORTFramed circular panel on a truck
BEFORE DISPATCH

A Clear Handover Starts Before Delivery

We work through the shipment details with the project team so packing, freight and receiving arrangements can be agreed together.

Package details
Packed dimensions, gross weight and the lifting arrangement.
Freight & delivery scope
Destination, route, freight terms, insurance and customs responsibilities.
Receiving-site access
Vehicle access, unloading space and suitable lifting equipment.
Records & receipt
Agreed packing photos and shipping documents, plus a condition check on arrival.
Factory workers handling slings beneath a large yellow lifting beam beside a steel-framed load.
Lifting beam and sling arrangement
Tall rectangular steel-framed package standing inside an open shipping container on timber supports.
Steel-framed load in a container
Large cylindrical acrylic component protected with wrap and sheet covering inside a steel transport frame.
Curved surfaces with protective covering
Transparent acrylic panel with dark cushioning and protective material fitted around its perimeter.
Protection at the panel edge
Workers beside a flatbed truck while a mobile crane handles a long framed acrylic load outside the factory.
Guiding a framed load
Wide view of a mobile crane and flatbed truck handling a large packaged acrylic load.
Crane and truck positioning
Large curved acrylic components with protective covering held upright in custom steel frames inside the workshop.
Frames for curved components
Protectively wrapped acrylic panels arranged flat on a pallet and upright on workshop supports.
Flat and upright panel packages
Wood-panelled crate suspended from lifting slings at the open end of a red shipping container.
Crate loading at the container
Large wrapped cylindrical acrylic component being handled by crane beside a transport vehicle.
Handling a cylindrical component
Rectangular acrylic panel stack wrapped and held in a metal frame with lifting slings laid across the top.
Framed panel stack and slings
Large clear acrylic panel resting horizontally on supports along the factory workshop floor.
Panel preparation before packing
Yellow vacuum lifting device with multiple suction pads resting on a large transparent acrylic panel.
Vacuum handling equipment
A FEW PRACTICAL QUESTIONSPACKING, FREIGHT & RECEIPT

About Packing & Shipping

Does every shipment use a wooden crate?

The outer support depends on the panel and handling route. Our examples include panelled crates, wrapped bundles and custom steel frames. Confirm the packing specification for your order rather than assuming one format for every panel.

How is the transport arrangement selected?

The packed dimensions, gross weight, route and unloading access guide the choice of transport equipment. Container suitability and any oversized-load arrangements are checked with the freight provider for the actual shipment.

What should the receiving team check?

Prepare the agreed unloading equipment and access before delivery. Check package condition and shipment details on arrival, and photograph any visible packing damage before unpacking. Follow the project handling plan when removing supports and protection.

Loading a framed acrylic package

Need Custom Pool or Aqua Acrylic?

Free Sample on Request

30 Years Warranty

Lead Time in 7-10 Days